The next steps, in order, and what the G3 readings decide.
The submission deadline is Thu 12 Nov 2026, 12:00 PST (Fri 13 Nov 01:30 IST). The tables on Limits and next steps carry the detail, with owners and dates where they are known.
Next
| Step | What it adds |
|---|---|
| final reading (about 12 Nov 06:17 UTC) | The measured validity window and whether reauthorize extends it. Auctions are sized to the result. The G2 guest card authorization early reading was taken on 9 Nov 00:09 UTC (partial capture of 1.00 accepted, reauthorize refused); it is not the G3 result. |
| A recorded walk of the five-minute path on the hosted app | A recording that shows the hosted flow from /try to the receipt. |
| A live-room speech test | Confirms the G5 synthetic-audio numbers with real room audio and background noise. |
| An owner decision on the 2.5 s to captured target | Hammer to captured is p95 3.77 s and hammer to settled p95 6.93 s (n=49, sandbox, run 42563147792, INCOMPLETE), against 2.5 s and 6 s: both missed. An earlier n=20 run had 3.01 s and 5.59 s. |
| Recorded demo auctions for | A hosted recording for the replay player, which already exists. |
| Independent review of SEC-19 and SEC-20 (OPEN) and of the PARTIAL rows (SEC-09, 10, 14, 15, 21 to 24) | Closes the open items of the 24-row checklist; SEC-15 has a scan (0 findings) but no second reviewer, and SEC-19 to SEC-24 are agent-only. |
| A manual accessibility pass | Screen reader and 200 percent zoom, on top of the automated sweeps. |